Garden lantern build log

A self-contained solar lantern for the secluded corner of Spring Court's communal garden: reclaimed laptop cells, a 20 W panel, two angled 10 W COBs, daylight and PIR switching, and cold-weather charge protection.

Spring Court, Lee-on-the-Solent · Michael Deakin · status at 25 November 2026

Pack in the battery box, BMS and MPPT in the top compartment
24 Nov: the pack in the battery box, BMS and MPPT positioned in the top compartment.
32 cells4S8P, reclaimed
16.52 Vpack, after 24 h rest
~230 Whusable at 4.0 V/cell
£250.82spent to date
Stage 1

Concept and layout

Before construction

The light sits on a 45 × 95 mm timber post about a metre and a half inside the recreation-ground boundary. The lantern hangs from a short arm and throws light into the garden corner; the battery box and the panel sit on the boundary side.

It is built in two parts: a short post set in the ground with forks at the top, and the pole that carries everything else. The pole and all its electronics and fittings are pre-assembled on the bench, so installation is only setting the post and mounting the pole into its forks.

Ground plan with light throw; 1.8 m elevation with lantern arm, 20 W panel and battery box; detail of the electronics and battery box on the timber
Updated layout (24 Nov). Left: ground plan, post on the boundary strip, light thrown into the garden. Centre: elevation, 1.8 m, with the lantern arm at the top, the 20 W panel on its bracket and the battery box on the 45 × 95 mm timber. Right: detail of the electronics and battery box on the pole.
Stage 2

Battery box

November 2026

Built from 4 mm faced ply with a sloped roof, PVA-sealed inside and lined with 4 mm pressed card. It is sized for the pack laid flat with a 50 mm compartment at the end for the BMS, MPPT, thermostat and regulators. Once complete it is sealed and not opened again.

Box sides and back glued up
Box under construction.
Box shell, open end
Box under construction.
Box end with roof
Box under construction.
Numbered 8P groups test-fitted in the box
Test fit of the numbered 8P groups.
Four groups laid out in the box
Four groups end to end.
Close view of group 1 in the box
Test fit, close view.
Groups 3 and 4 in the box with lid
Test fit, lid alongside.
Stage 3

Light and post

12–13 November 2026

The single 20 W COB was replaced by two 10 W COB panels mounted on the angled faces of a folded aluminium reflector and hung inside the lantern, so the light goes forward and sideways into the corner and none goes back towards the field. The aluminium also spreads their heat. The 10.5 V lamp regulator stays in the lantern base.

Two COB strips on a folded aluminium reflector
12 Nov: two 10 W COBs on the reflector insert.
Post with lantern on its arm
13 Nov: lantern on the post's arm, test lit.
Post marked with sensor box and panel positions
Positions as first marked: daylight sensor box behind the lantern base (the sensor has since moved into the control box); panel half a metre below the elbow, field side.
Silver-finished pole with lantern on the arm, post forks beside it, panel on its bracket
24 Nov: pole painted and varnished with the lantern on its arm; post forks beside it; panel fitted to its bracket.
Stage 4

Electronics and fixings

Ordered and arriving

LM393 daylight sensor board
Daylight sensor (LM393), DO high in darkness.
Mini-360 buck regulator
Mini-360 buck: W1209 and sensor supplies.
Triangular PV mounting bracket
PV mounting bracket.
SD30CRMA MPPT board with heatsink
SD30CRMA MPPT. Heatsink: one of the large BMS-type heatsinks with a fin cut off flush, laid across both chips.
Stage 5

Pack assembly

23 November 2026

The 32 reclaimed cells were charged together as a 32P block, rested, then split back into four 8P groups, each reading 4.13 V. The groups were stacked with drilled Tupperware spacers whose holes line up with the cell channels, linked in series with flex from the lantern's mains gear, and wired to a 4S BMS through a single sleeved balance loom. A ply carrier stick carries one NTC bead per group, each held by a narrow band of heatshrink over its legs. The bead is lifted off the stick so its legs spring it into the narrowing gap between two adjacent cells in the centre channel. The finished carrier is a snug fit in the 8P groups' channels; the spacer holes on the carrier line were opened out to 10 mm to pass it. The red-tipped stick became the thermistor carrier, as it leaves more void around the beads; each end is wrapped with masking tape to stop it racking. The square black-tipped fillet was not needed there, so it now carries the balance leads, each heatshrunk to its own face, keeping them apart from each other. On 25 November the carrier was threaded through the pack and the pack rebuilt; a borescope check confirmed every bead makes good contact with its two cells. Assembled, the pack reads 16.54 V through the BMS, and 16.52 V after 24 hours' rest.

Drilled pack spacers and BMS with heatsinks
Spacers with vent holes; BMS with heatsinks.
Sleeved balance loom on the BMS
Balance loom, branches spaced to the group joints.
Two ply strips, black and red tipped
Red-tipped stick: thermistor carrier. Square black-tipped fillet: balance-lead carrier.
Thermistor beads fitted along the carrier stick
25 Nov: the rebuilt carrier, four NTC beads standing off the stick on their legs, wiring covered along its length.
Groups stacked with spacers on ply base
Groups stacked on the spacers.
Side view of the four groups with loom
Side view: four groups, loom along the top.
Pack banded with tape, carrier stick in place
Banded, carrier stick in the channel.
Banded pack with BMS and leads
The complete pack with BMS and power leads.
Assembled 4S8P pack with BMS seated in the plywood battery box
23 Nov: the finished pack seated in the battery box, BMS at the electronics end. On 24 Nov the heat-shrink sleeve was taken off the loom and leads because it strained the BMS connections.

Next

Circuit and wiring diagrams: Garden lantern circuit and wiring